Project name: Lot 2
Project name: Lot 2
- Casting concrete for top slab of triple box culvert Pk 4+669
- Casting Lean concrete for apron slab of double box culvert Pk 4+932 LHS
- Joint survey of checking elevation Top base course Pk 0+000 to Pk 1+000 BS
- Field density test Top base course Pk 0+000 to 1+000 BS
- Reinforcement concrete for concrete pavement Pk 3+900 to 4+200 LHS
- Casting concrete for concrete pavement Pk 3+900 to 4+200 LHS
- Joint survey of checking elevation Top sub base 0+300 to 0+484 BS ( Kampong Prasat)
- FDT top sub base Pk 0+300 to 0+484 BS (Kampong Prasat)
- Proof rolling test top sub base Pk 0+300 to 0+484 BS(Kampong Prasat)