Cambodia Southeast Asia Disaster Risk Management Project II

INTRODUCTION

From September to November 2020, Cambodia experienced heavy rainfall across the country. The heavy rains caused extensive flooding in 20 out of 25 provinces, leaving an estimated 800,000 people directly affected, of which 49% (388,000 people) had pre‐existing vulnerabilities. The floods have caused damage to key transport infrastructure and loss of economic activities. According to the rapid damage and needs assessment conducted by the World Bank at the request of the Ministry of Economy and Finance (MEF), economic loss due to flooding was estimated at US$ 448‐490 million. Three sectors that were most affected include transport, irrigation, and agriculture, concentrating in nine provinces. Total costs for rehabilitation of the damaged transport infrastructure were approximately US$508 million. It was noted that these floods came amidst a drought which did not only cause widespread crop failure, loss of assets, disruption of livelihoods but also exacerbate the inherent vulnerability of numerous households who are disadvantaged and are in areas that are prone to floods, other natural hazards.
The purpose of the second Cambodia Southeast Asia Disaster Risk Management Project (KHSEADRM2) is to support the government in its short‐term effort to reconstruct the transport infrastructure affected by the flash floods in 2020, thereby resuming overall transport connectivity. In a longer term, the project aims to support
the government to enhance its capacity and resilience to future impact of natural disaster risks through improving and mainstreaming disaster risk management (DRM) dimensions into its national long‐term disaster risk management strategy, particularly in transport infrastructure. The KH‐SEADRM 2 Project is built on the on‐going KH‐SEADRM project (P160929) and will finance resilient post‐disaster road reconstruction of approximately 400km of rural roads and bridges in selected provinces that are affected by floods, including Banteay Meanchey, Battambang, Kampong Speu, Kampong Chhnang, Pursat, Siem Reap and Tbung Khnum provinces. Among these, infrastructure reconstruction activities will be mainly in Banteay Meachey, Battambang, Pursat, and Siem Reap which are among the poorest provinces where rural roads are badly damaged. In addition to support in infrastructure rehabilitation, the project also strengthens institutional capacity in DRM planning in national and rural development sector, including policy making processes. The project will also respond to crisis and emergencies related to natural disaster risks if these happened during project life.

Proposed Project Development Objective

The Project Development Objective (PDO) is to support the Royal Government of Cambodia (RGC)’s resilient reconstruction of vulnerable rural transport infrastructure affected by the 2020 floods and recurring flood events, mainstream Disaster Risk Management (DRM) in government processes, and provide immediate and effective response in case of an Eligible Crisis or Emergency.

New Documents and Reports

Document and Report from Cambodia Southeast Asia Disaster Risk Management Project II
The ESF instruments had been disclosed for the first time on November 15, 2021, prior public consultations held on November 17, 2021. Inputs from the consultations, site visits, indeep analysis of E&S risks and impacts, and through WB internal Quality Control formed the basis for the finalization of ESF instruments redisclosed here for further comments and suggestions prior project appraisal. PMU of KHDRM-II, MRD

ផែនការគ្រប់គ្រងបរិស្ថាន និង សង្គម

គម្រោងអភិវឌ្ឍន៍នេះមានគោលបំណងជួយដល់ការកសាងឡើងវិញនូវហេដ្ឋារចនាសម្ព័ន្ធផ្លូវជនបទ ឱ្យ​មាន​ភាពធន់ បន្ទាប់ពីវា​បាន​រងការខូចខាតដោយសារទឹកជំនន់ឆ្នាំ២០២០ និងព្រឹត្តិការណ៍ទឹកជំនន់ឯទៀតដែល​​​កើតឡើងជាញឹកញាប់,​ ធ្វើ​ការ​បញ្ជ្រាបការគ្រប់គ្រងហានិភ័យគ្រោះមហន្តរាយទៅក្នុងរាល់​ដំណើរការការ​ងារ​របស់រដ្ឋាភិបាល និងដើម្បីធ្វើការឆ្លើយតបឱ្យទាន់ពេលវេលា និងប្រកបដោយប្រសិទ្ធភាព ក្នុងករណីមានវិបត្តិឬគ្រាអាសន្នកើតឡើងភ្លាមៗ។ គោលបំណងនេះនឹងសម្រេចឱ្យ​បានតាមរយៈការអនុវត្តសកម្ម​ភាព​នានា​ដែលត្រូវបានរៀបចំជាបួនសមាសភាគ។ សមាសភាគនីមួយៗមានសេចក្តីបរិយាយលម្អិតផ្នែក ១.២ នៅក្នុងក្របខណ្ឌ​​គ្រប់គ្រងបរិស្ថាន និង​សង្គម។ ...

ក្របខ័ណ្ឌគ្រប់គ្រងសុវត្ថិភាពបរិស្ថាន និងសង្គម (ក.គ.ប.ស)

ធនាគារពិភពលោកកំពុងគាំទ្ររាជរដ្ឋាភិបាលកម្ពុជាក្នុងការផ្តល់ KH-SEADRM ២. ក.គ.ប.ស នេះ កំណត់នូវគោលការណ៍ ច្បាប់ គោលការណ៍ណែនាំ និងនីតិវិធី ដើម្បីវាយតម្លៃនិងកាត់បន្ថយហានិភ័យបរិស្ថាន និងសង្គម និងផលប៉ះពាល់សក្តានុពលនៃ KH -SEADRM ២. ក.គ.ប.ស មានវិធានការ ក្របខ័ណ្ឌ និងផែនការក្នុងការកាត់បន្ថយ សម្រាល ...

ផែនការស្តីពីការជំរុញ ការចូលរួមរបស់ភាគីពាក់ព័ន្ធ

នេះគឺជាឯកសារ ផែនការស្តីពីការចូលរួមរបស់ភាគីពាក់ព័ន្ធ (SEP) រៀបចំ ដោយក្រសួងអភិវឌ្ឍន៍ជនបទ (MRD) សម្រាប់គម្រោងគ្រប់គ្រងហានិភ័យគ្រោះមហន្តរាយ នៅកម្ពុជា អាស៊ីអាគ្នេយ៍ ជំហាន 2 (KH-SADRM2) ចូលរួមដោយមន្រ្តីទទួលបន្ទុកផ្នេកសង្គមនិងបរិស្ថាន (SEO) របស់ខ្លួន និង គាំទ្រដោយទីប្រឹក្សាជាតិ និងអន្តរជាតិ។ ផែនការស្តីពីការចូលរួមរបស់ភាគីពាក់ព័ន្ធ នឹងអនុវត្តកម្មវិធីវិនិយោគទាំងឡាយនៅក្រោម ...

ផែនការប្តេជ្ញាចិត្តបរិស្ថាន និងសង្គម

រាជរដ្ឋាភិបាលកម្ពុជា នឹងអនុវត្តគម្រោងការគ្រប់គ្រងហានិភ័យគ្រោះមហន្តរាយនៅអាស៊ីអាគ្នេយ៍ សម្រាប់ កម្ពុជាលើកទី ២ (គម្រោង) តាមរយៈក្រសួងអភិវឌ្ឍន៍ជនបទ (ក.អ.ជ) ដែលមានការពាក់ព័ន្ធនឹងក្រសួង ស្ថាប័នដូចជា ក្រសួងសេដ្ឋកិច្ច និងហិរញ្ញវត្ថុ (តាមរយៈអគ្គនាយកដ្ឋានដោះស្រាយផលប៉ះពាល់ដោយសារគម្រោងអភិវឌ្ឍន៍), និងមន្ទីរអភិវឌ្ឍន៍ជនបទក្នុងខេត្តចំនួន ៦ ។ សមាគមអភិវឌ្ឍន៍អន្តរជាតិ (ពីនេះតទៅហៅថា “សមាគម”) បានយល់ព្រមផ្ដល់ហិរញ្ញប្បទានដល់គម្រោងនេះ។ ...

STAKEHOLDER ENGAGEMENT PLAN

The Stakeholder Engagement Plan (SEP) has been prepared by the Ministry of Rural Development (MRD) for the Cambodia Southeast Asia ...

ENVIRONMENTAL AND SOCIAL MANAGEMENT PLAN

The project development objective is to support resilient reconstruction of vulnerable rural transport infrastructure affected by the 2020 floods and ...

ENVIRONMENTAL AND SOCIAL MANAGEMENT FRAMEWORK

Associated Facilities means facilities or activities that are not funded as part of the project and, in the judgment of ...

ENVIRONMENTAL AND SOCIAL COMMITMENT PLAN

The Royal Government of Cambodia (hereinafter RGC) shall implement the Cambodia Southeast Asia Disaster Risk Management Project II (the Project), ...

ENVIRONMENTAL AND SOCIAL MANAGEMENT PLAN

From September to November 2020, Cambodia experienced heavy rainfall across the country. The heavy rains caused extensive flooding in 20 ...

Relevant documents to the project can be retrieved here